This website is the Texas Department of Transportation’s on-line source for The East Branch - SH 190 Transportation Study in Dallas County, Texas. The study will involve two steps - a Major Transportation Study (MTS) and environmental documentation and preliminary engineering. These steps are typically followed by final design and project construction.
Your participation is needed! Decisions made during the study process will affect area transportation for decades to come. The East Branch project has numerous opportunities for you to get involved. Visit this web site regularly to get project updates, send comments, check the Public Meeting schedule, and view our study graphics.
Future Public Hearing Date
The Draft EIS (DEIS) for SH 190 East Branch is being prepared in accordance
with the National Environmental Policy Act (NEPA). The document must undergo
review by the TxDOT-Austin office; once approved by TxDOT Austin, the DEIS
must be reviewed and approved by the Federal Highway Administration (FHWA)
per environmental and legal conformity.
Once the DEIS is approved by the FHWA, a Public Hearing will be conducted.
This Public Hearing could possibly occur in early 2009. Once the
Public Hearing is scheduled, the date and time will be posted on the website
and relayed to all who have registered to be on the project mailing list as
well as property owners located within or immediately adjacent to the
potential right-of-way. Following the Public Hearing, a Final EIS (FEIS)
will be prepared to recommend an alternative.
|